EXPANSION OF THE PRODUCTION FACILITY OF MANN+HUMMEL INNENRAUMFILTER (CZ) S.R.O., UHERSKÝ BROD
Construction period: | 05/2023 - 12/2024 |
---|---|
Investor: | MANN+HUMMEL Inneraumfilter (CZ) s.r.o. |
Volume-area: | Usable area 9.434 m2 |
Scope of Work: | General delivery |


The implementation of the extension of the production plant includes the addition of a warehouse and a production hall, including a three-story extension with a technical floor, an administrative floor and a floor with new changing rooms. Modifications of the existing hall were also included. The key requirement in the solution concept was the implementation of fossil-free heat sources together with high energy efficiency and the requirement for maximum heat recovery and free cooling within the operation of the HVAC equipment. The new building is equipped with new efficient systems for ventilation, heating and possibly cooling the production premises. Heat is supplied exclusively by heat pumps.