Pellet factory, Ždírec nad Doubravou
Construction period: | 11/2014 – 06/2015 |
---|---|
Investor: | Stora Enso Wood Products Ždírec s.r.o. |
Implementation of the building for the installation of the technology line for the production of pellets and construction of buildings for storage and shipping. Further, securing nine meters high hill about 250m in length, the foundations for the pipe bridges, modification roads and paved areas, and all utility connections for technological units.
Pellet factory consists of two silos, manufacturing and technology hall and high transport system