INDUSTRIAL PARK EICHENAUER Nový Bydžov
Project: | Industrial Park EICHENAUER Nový Bydžov |
---|---|
Construction period: | 06/2015-08/2016 |
Investor: | Dr. Manfred Stoll |
Volume-area: | Floor area 4.400 m2 |
Scope of Work: | General delivery |

New industrial park with an admi-nistrative building, a manufactory and storage hall for production of moldings from granules and assembly of final products. A condition of the contract was to prepare a study of the environmental impact (EIA).