Project: | HEAT AND ELECTRICITY COGENERATION PRODUCTION FACILITY Ždírec nad Doubravou [en] |
Construction period: | 07/2012 - 03/2013 |
Investor: | STORA ENSO WOOD PRODUCTS Ždírec s.r.o., technologie: URBAS Maschinenfabrik GmbH |
Volume-area: | ground-floor space: 2.300 m2, enclosed space: 31.700 m3, length of the collector for transportation : 140 m, area of new asphalt roads: 2.200m2 |
Scope of Work: | delivery of all infrastructure connections, reinforced concrete bearing structure including underground collector, construction of office and technical facilities and exterior aspfhalt and paved surfaces and earth bank |