EXTENSION OF THE EXISTING ASSEMBLY HALL AND ADMINISTRATIVE BUILDING OF SEW EURODRIVE CZ s.r.o., HOSTIVICE NEAR PRAGUE

Construction period:11/2021 - 06/2023
Investor:SEW-EURODRIVE CZ s.r.o.
Photo: EXTENSION OF THE EXISTING ASSEMBLY HALL AND ADMINISTRATIVE BUILDING OF SEW EURODRIVE CZ s.r.o., HOSTIVICE NEAR PRAGUE
PDF: icon

This is an extension of the existing assembly hall and an extension of the administrative part of the building. The construction of the existing hall with an administrative building was built by our company in 2011. The existing building was in full operation and construction works were done without any interruption of operation. New technologies and other related assembly and service operations are now located in the extension. There is office workplaces in the administrative part and the facilities for the production hall employees have been also be expanded. The assembly hall will be extended in three directions to the neighboring undeveloped land. The total built-up area of the new hall building is over 4,000 m2. The extended assembly hall consists of the 1st floor and a partial built-in 2nd floor. The new extension of the administrative part  also has 2 floors, where at the 2nd floor level has been connected by a footbridge with the existing administrative part. Characteristics of the use of the hall remains unchanged from the original state, it continues to be the completion of engineering products - mainly gearboxes and similar products for the automotive industry and their subsequent dispatch. The assembly hall includes storage racking systems for products.The load-bearing structure of the building consists of a prefabricated skeleton supplemented by a steel structure for the construction of facade panels, skylights and sunblinds. The skeleton has been founded on piles supplemented by foootings. The ceilings are made of reinforced concrete prestressed slabs. The stairs have been made of prefabricated reinforced concrete.The composition of the roof have been made of trapezoidal sheets and insulating layers have been covered by PVC-P foil. For the administrative building, the trapezoidal metal sheets were replaced by reinforced concrete ceiling prestressed slabs. There is a fibre-concrete "industrial" floor in the assembly hall. The facade of the hall consists of sandwich insulation panels in combination with windows. The facade of the office building is designed using insulating system panels, it is the Trimo Qbiss system. The insulating wall panels of the hall building are anchored to reinforced concrete columns and, in the case of an office building, to an auxiliary steel structure. The appearance of the facades is identical to the facades of the existing building. As part of the expansion of existing buildings, the existing heating, cooling, ventilation systems and electrical installations were expanded and modified. The extension of the hall and the administrative part include partial relocations of the existing networks, new engineering networks and connections, as well as newly built paved areas, roads and car parks. Furthermore, external area lighting and landscaping were supplemented and expanded.

REFERENCE SHEET