A new logistic hall – V. phase Windmöller&Hölscher Prostějov
Construction period: | 10/2016 - 09/2017 |
---|---|
Investor: | Windmöller&Hölscher Czech s.r.o. |
Volume-area: | Built-up area 3.745 m2, Paved areas 4.295 m2 |
Scope of Work: | General delivery |
The 5th phase of the construction of a new building facility for assembly of machinery and equipment for the production of packaging follows up the existing assembly and expedition hall. The hall is one-storey, double-glazed with a saddle roof and is made up of a steel structure based on the piles. The hall contains 3 floors of inbuild structure which occupies part of its internal area. Its external cladding is partly formed of hall external cladding and the roof forms its roof structure.